AERATION BLOWER REPLACEMENT

Clients: Linda County Water District

Location: Olivehurst, CA

OVERVIEW

The Linda County Water District (District) owns and operates a tertiary Wastewater Treatment Plant (WWTP) with a permitted capacity of 5.0 MGD ADWF. The WWTP’s aeration blower system, which consists of three high-speed turbo blowers, was constructed in 2011 but quickly became improperly sized due to changes in the flows and loads observed at the WWTP. This resulted in an aeration blower system that was incapable of efficiently meeting typical daily aeration demands and had to be operated manually with frequent wasting of excess air. This placed a substantial operational strain on WWTP staff and reduced aeration and energy efficiency for the overall aeration system.

RBI worked with District staff to identify an alternative to the installed aeration blower system that could replace two of the three existing blowers to provide adequate air for the aeration system under all operational conditions. This modified blower system would result in reduced wasting of excess air, improved treatment and energy efficiency, and reduced operational oversight needed for the aeration system.

RBI prepared a preliminary design and Basis of Design Report for the new aeration blower system. RBI then prepared specifications and contract documents for the project and facilitated the bid process on behalf of the District. Upon contractor selection and initiation of construction, RBI served as the District Representative, which included management of the construction contractor, engineering services during construction, submittal review/response, request for information (RFI) review/response, change order development/review/approval, startup/acceptance testing facilitation, and leadership of all project construction meetings. During the construction process, RBI staff were on-site weekly to review construction progress and ensure the project was constructed and operated according to the design intent. Construction of Phase 1 of the project (first blower replacement) was completed in summer 2025 and construction of Phase 2 of the project (second blower replacement) is anticipated for completion in early 2027. RBI also developed new dissolved oxygen controls for the aeration system, which are now in use due to the modified aeration blower system.

With Phase 1 of the project fully operational, the new aeration blower system and control strategy have resulted in enhanced aeration efficiency, which has substantially reduced the aeration system energy usage and has improved aeration operations. Additional aeration and energy efficiency gains are expected upon completion of Phase 2 of the project.

PROJECT INFO

Client: Client: Linda County Water District

Location: Olivehurst, CA

AREAS OF EXPERTISE