The City of Lodi owns and operates the White Slough Water Pollution Control Facility (WPCF). Much of the facility that exists today was constructed in the early 2000s. Aging equipment and maintenance challenges with the WPCF’s aeration diffuser system were resulting in inefficient biological treatment of the wastewater for nitrogen removal.

RBI conducted a feasibility analysis, including development of life cycle cost estimates, to determine the best solution from operational, maintenance, and cost perspectives for rehabilitation and/or replacement of the aeration diffuser system. This effort included workshops and discussions with City staff to identify alternative aeration diffuser technologies that would increase aeration efficiency and reduce maintenance intensity. The feasibility analysis concluded with a determination that replacement of the existing aeration diffuser system was the most effective approach to satisfying the City’s needs for the system.

RBI then prepared a preliminary design and Basis of Design Report for a new aeration diffuser system, including 9-inch disc aeration diffusers, aeration droplegs, air flow control valves, and other aeration appurtenances, as well as the development of aeration zones for improved aeration control. RBI completed the final design, for which engineering drawings, specifications, contract documents, and an engineer’s cost estimate were prepared. During the preparation of these documents, RBI frequently solicited client input, including from WPCF operations and maintenance staff, to ensure that the project would be delivered and constructed to client satisfaction. RBI provided assistance during bidding for the project, including leading the pre-bid site walk and reviewing bid proposals. RBI also provided engineering services during construction, including reviewing and responding to submittals and requests for information (RFIs), developing and reviewing change orders, facilitating startup and acceptance testing, and hosting and leading all project construction meetings. During the construction process, RBI staff were on-site weekly to review construction progress and ensure the project was constructed and operated according to the design intent. RBI also developed new dissolved oxygen controls for the aeration system and worked hand-in-hand with the City’s SCADA/PLC integrator to implement the controls and ensure proper functionality. Upon completion of construction in summer 2025, RBI assisted the City with project closeout and produced record drawings.

With the project fully operational, the new aeration diffuser system and controls have resulted in enhanced aeration efficiency, which has substantially reduced the aeration system energy usage and greatly improved aeration operations efficiency. Further, the aeration system that used to be an operational and maintenance challenge, has now been transformed into a largely hands-off system that provides consistent and reliable treatment.

PROJECT INFO

Client: City of Lodi

Location: Lodi, CA

AREAS OF EXPERTISE