BASIN PLAN AMENDMENTS/USE ATTAINABILITY ANALYSES

Clients: El Dorado Irrigation District, State of California, City of Vacaville

Location: Central Valley, California

OVERVIEW

RBI is an industry leader in the arena of water quality standards refinement. RBI has collaborated with wastewater dischargers and the Central Valley Regional Water Quality Control Board to develop and adopt amendments to the Water Quality Control Plan for the Sacramento River and San Joaquin River Basins (Basin Plan) that have been subsequently approved by the State Water Resources Control Board and U.S. EPA and are in effect. The Basin Plan amendments resolved NPDES permit compliance issues for wastewater dischargers that would have otherwise required expensive, unnecessary treatment plant modifications while at the same time refined the applicable water quality objective.

RBI developed site-specific objectives for Deer Creek, El Dorado and Sacramento Counties, pH, turbidity, and temperature as the appropriate means of resolving key NPDES permit compliance issues for the El Dorado Irrigation District’s Deer Creek Wastewater Treatment Plant. These site-specific objectives saved approximately $20 million in unnecessary plant upgrades. The Deer Creek pH and turbidity site-specific objectives developed by RBI provided the scientific basis to subsequently amend the Basin Plan pH and turbidity water quality objectives applicable to the entire Sacramento River and San Joaquin River basins.

Finally, RBI developed site-specific objectives for chloroform, dibromochloromethane, and dichlorobromomethane for reaches of New Alamo and Ulatis creeks in Solano County. These site-specific objectives were developed based on findings from a use attainability analysis prepared by RBI showing that municipal and domestic supply (MUN) was not an existing or attainable use of the creeks. The resulting objectives resolved an ongoing compliance issue for the City of Vacaville’s Easterly Wastewater Treatment Plant, which would have had to implement treatment modifications to reduce concentrations of these trihalomethane compounds had the new objectives not been adopted.

PROJECT INFO

Clients: El Dorado Irrigation District, State of California, City of Vacaville

Location: Central Valley, California

AREAS OF EXPERTISE