BRENTWOOD WWTP Phase II Expansion

Clients: City of Brentwood

Location: Brentwood, Contra Costa County, California

OVERVIEW

RBI conducted a preliminary wetland investigation to support the City of Brentwood’s Wastewater Treatment Plant Phase II Expansion Project. Within the project area, a wetted zone supporting a robust assemblage of wetland vegetation was observed. Through detailed analysis of soil hydrology, RBI was able to deduce that the area was artificially maintained through irrigation rather than functioning as a true wetland system.

Artificially irrigated areas—such as those influenced by water infrastructure leaks—may exhibit wetland characteristics at the surface but would revert to upland conditions if irrigation ceased. Accurately identifying these conditions is essential to prevent unnecessary costs and delays associated with permitting, reporting, and mitigation for wetlands. RBI provided defensible, site-specific data to regulatory agencies demonstrating the site’s negative wetland determination, allowing the City of Brentwood to advance the project without undue regulatory burden.

PROJECT INFO

Clients: City of Brentwood

Location: Brentwood, Contra Costa County, California

AREAS OF EXPERTISE