CHLORAMINATION
AIR STRIPPING STUDY
& PILOT SYSTEM
Client: City of Brentwood
Location: Brentwood, CA
Client: City of Brentwood
Location: Brentwood, CA
OVERVIEW
The City of Brentwood owns and operates a tertiary wastewater treatment plant (WWTP) with a design capacity of 5.0 MGD ADWF. The City enlisted RBI to develop and implement a pilot study at its WWTP with the primary goal to explore and evaluate two distinct strategies for reducing the formation of trihalomethanes (THMs), a regulated class of disinfection byproducts, to ensure the WWTP’s effluent remained compliant with NPDES requirements.
RBI designed a comprehensive pilot study to test two cutting-edge treatment methods. The first was chloramination, a process involving the addition of ammonia upstream of the addition of chlorine. This forms a more stable disinfectant, which can significantly reduce the creation of THMs. The second method involved the use of an air stripping pilot system, which physically removes volatile organic compounds like THMs from the water stream by exposing the water to a flow of air.
Our team was responsible for the entire technical and operational framework of the pilot study. This included:
1) Detailed Research and Calculations: RBI performed an in-depth analysis to determine the optimal conditions for each process, including chemical dosages as well as air and water flow rates.
2) Equipment and Materials Specification: RBI developed detailed specifications for all necessary equipment, including chemical feed pumps, air stripping towers, blowers, and monitoring sensors.
3) Protocol Development: RBI created rigorous monitoring protocols and data analysis procedures to ensure the scientific validity and reliability of the results. This included establishing precise methods for dose monitoring and control.
Beyond the initial design, RBI played a crucial role in on-site adaptive management throughout the experimental phase. Our on-site presence allowed for immediate, real-time adjustments to the pilot system based on incoming data. RBI provided expert guidance and troubleshooting, ensuring the experiments were conducted efficiently and effectively. This hands-on approach was essential for collecting the high-quality data needed to accurately evaluate the feasibility and long-term viability of each technology. The successful execution of this pilot study provided the City with the critical data and technical confidence needed to select the most effective and cost-efficient strategy for long-term THM control.
PROJECT INFO
Client: City of Brentwood
Location: Brentwood, CA
AREAS OF EXPERTISE
Wastewater chloramination and air stripping pilot studies
Trihalomethane management and reduction
Wastewater disinfection alternatives
Wastewater treatment
NPDES trihalomethane permit compliance
Monitoring protocols and data analysis procedures