CHLORAMINATION SYSTEM DESIGN

Client: City of Turlock

Location: Olivehurst, CA

OVERVIEW

The City of Turlock owns and operates the Regional Water Quality Control Facility (RWQCF). The RWQCF currently utilizes a chlorine disinfection process to produce disinfected tertiary recycled water, consistent with Title 22 of the California Code of Regulations. Chlorine disinfection processes have the potential to produce disinfection by-products, such as chloroform, bromoform, dichlorobromomethane (DCBM) and chlorodibromomethane (CDBM) (collectively referred to as Trihalomethanes (THMs)). DCBM and CDBM are regulated by the City’s two NPDES permits that allow discharge into the Delta Mendota Canal (DMC) and the San Joaquin River. The City’s discharge to the DMC is limited to nearly 6 MGD less than the RWQCF design capacity primarily due to elevated effluent THM concentrations.

RBI prepared an alternative analysis (including a bench-scale study and cost analysis) to determine the recommended disinfection alternative to reduce trihalomethane concentrations in the RWQCF effluent and allow for increased recycled water discharge to the DMC (see the RWQCF Trihalomethane Reduction Alternatives project). The results of the bench-scale testing indicated that chloramination would be the preferred and most effective option to reduce THM concentrations in the RWQCF effluent.

RBI is currently assisting in preparing a plan for implementation of a full-scale trial chloramination system. The intent is to verify that under full-scale conditions, sufficient disinfection is achieved to comply with effluent total coliform limitations, effluent trihalomethane concentrations are reduced, and effluent ammonia concentrations remain in compliance with NPDES permit limitations. The plan is also intended to determine the equipment, controls, monitoring, and procedures necessary for full-scale implementation of the chloramination system. RBI assessed different ammonia dosing options, analyzed historical flows to determine anticipated dosing pump operating conditions, and coordinated with the vendor to prepare a quote. RBI also assisted with reviewing and providing comments on the submittal received for the dosing pump skid. Upon completion of this plan, RBI will assist the City with implementation, startup, and operation of the full-scale trial chloramination system.

PROJECT INFO

Client: City of Turlock

Location: Turlock, CA

AREAS OF EXPERTISE