ENVIRONMENTAL  SERVICES

ESA SECTION 7 CONSULTATIONS

Determining Project Effects on ESA Species, Developing Project Conservation Measures, and Negotiating Incidental Take Authorization

OVERVIEW

RBI staff have directed and conducted numerous Endangered Species Act (ESA) consultations for various projects and clients involving anadromous fish (i.e., Chinook Salmon, Steelhead and Green Sturgeon), Delta Smelt, Giant Garter Snake, Valley Elderberry Longhorn Beetle and their designated critical habitats. RBI staff’s experience in preparing Biological Assessments (BAs) to evaluate project-related effects on ESA-listed species has been demonstrated through their work on the following projects.

•  City of Lathrop Wastewater Treatment Plant Outfall in San Joaquin River

•  City of Stockton Modifications Project and New Outfall in San Joaquin River

•  Mountain House Wastewater Treatment Plant Outfall in Old River

•  Ironhouse Sanitary District Wastewater Treatment Plant Outfall in the San Joaquin River

•  City of Chico Wastewater Treatment Plant Expansion

•  City of Modesto Wastewater Treatment Plant Expansion & Upgrade

•  City of Brentwood Wastewater Treatment Plant Expansion & Upgrade

•  California Rice Commission Salmon Rearing Pilot Project

•  California Rice Commission Salmon Rearing Practice Standard

•  Brannan-Andrus Levee Maintenance District Erosion Repair and Habitat Enhancement

•  Private Landowner River Shake Construction

•  Village West Marina Dock Replacement

•  Lost Isle Dock Reconfiguration

•  RD 1600 Pipe Replacement

•  RD 2103 Windswept Land and Cattle Company Intake Pipe Replacement

•  Bogle Irrigation Pipe Replacement

•  Grasshopper Slough Levee Modifications

•  Private Landowner Dock Replacement on the Sacramento River

•  Port of Stockton CHABS Dredging Pilot Study

•  RD 2062 Road Crossings of Stewart Canal

•  RD 2062 Intake Pipe Replacement

•  Yuba Water Agency Water Supply and Habitat Enhancement

•  Yuba Water Agency Cottage Creek Dam Modification

•  Yuba Water Agency’s Atmospheric River Control (ARC) Spillway Project

•  Yuba Water Agency’s Daguerre Point Nature-Like Fishway Project

•  USACE’s Ongoing Operations and Maintenance at Englebright Dam

•  USACE’s Ongoing Operations and Maintenance at Daguerre Point Dam

•  Reinitiation of ESA Consultation on USACE’s Ongoing O&M at Daguerre Point Dam

•  Yuba Water’s Yuba River Development Project (YRDP) License Amendment (Federal Energy Regulatory Commission (FERC) Project No. 2246) to Install a Full-Flow Bypass Structure on the Narrows 2 Hydropower Facility on the Lower Yuba River

•  Yuba Water’s Applicant-Prepared Draft BA for Yuba Water’s YRDP Hydropower Relicensing

Several RBI staff also assisted NMFS in the development of the 2014 Recovery Plan for the Evolutionarily Significant Units (ESU) of Sacramento River Winter-Run Chinook Salmon and Central Valley Spring-Run Chinook Salmon and the Distinct Population Segment (DPS) of California Central Valley Steelhead.

PRIMARY AREAS OF EXPERTISE

FEATURED PROJECTS