OVERVIEW
The El Dorado Irrigation District (District) needed support to address a long-standing challenge with its Deer Creek Wastewater Treatment Plant (WWTP) to achieve compliance with final effluent zinc limitations required by its NPDES permit. After years of effort—including discontinuing zinc orthophosphate use, conducting dilution studies, and preparing pollution prevention plans—the District identified a new, promising solution: using magnesium hydroxide (Mg(OH)2) instead of the existing sodium hydroxide (NaOH) for alkalinity and pH control. This change was projected to increase effluent hardness, which in turn would raise the zinc effluent criteria, ultimately eliminating the reasonable potential for zinc levels to exceed permit limits.
To confirm this hypothesis and evaluate the practical implications of implementing this change, the District engaged RBI to design, implement, and manage a comprehensive pilot study. RBI’s work on this pilot study was a multi-faceted effort that began with an extensive technical evaluation. Our team performed scaling potential analyses to estimate the likelihood of Mg(OH)2 causing scale buildup on the WWTP’s ultraviolet (UV) lamp sleeves. RBI also conducted a thorough literature review and survey of other Central Valley wastewater treatment facilities to identify best practices and potential operational challenges, such as particulate settling or the potential for struvite formation.
A key component of our technical services was the jar-testing phase. RBI directed a series of on-site experiments to verify that the Mg(OH)2 product would be fully soluble, to ensure that no unexpected precipitates would form, and to confirm the relationships between dose, pH, alkalinity, and hardness.
Based on our research and jar-testing results, RBI provided detailed recommendations for the full-scale pilot system, including equipment specifications for storage requirements, feed pump, and piping. RBI’s team performed hydraulic calculations to ensure proper mixing within the treatment channels.
RBI developed monitoring protocols for parameters such as pH, alkalinity, and hardness, and provided a detailed startup schedule for gradually transitioning from NaOH to Mg(OH)2 to allow the biological processes within the WWTP to adjust.
PROJECT INFO
Client: Client: El Dorado Irrigation District
Location: El Dorado Hills, CA
AREAS OF EXPERTISE
Wastewater pilot studies
Jar-testing
Wastewater treatment
Chemical treatment design using magnesium hydroxide for alkalinity and pH control
NPDES permit compliance by increasing effluent hardness to increase the zinc effluent water quality objective
Scaling potential analysis
Hydraulic calculations