UTILITY FORMATION (ESPA)

Clients: Eastside Power Authority (ESPA)

Location: San Joaquin Valley, California

OVERVIEW

ESPA is a Joint Powers Authority and Local Regulatory Authority formed under Irrigation District Law and is comprised of four Irrigation and Water Districts that are located along the east side of the San Joaquin Valley. ESPA serves 32 water pumping loads that aggregate to 13 MW of demand and consume 35 million kWh per year. ESPA’s foundation is its long-term contract for Central Valley Project (CVP) hydro power that supplies 40 to 60 percent of the energy it consumes to pump the Districts’ CVP water.

RBI staff conceived and developed the operations of ESPA by securing Direct Access service from Southern California Edison (SCE). RBI directed the design of custom software to facilitate daily scheduling of load and resources, designing utility budgets, rate design, operations and regulatory reports, and annual cost reconciliation processes.

PROJECT INFO

Clients: Eastside Power Authority (ESPA)

Location: San Joaquin Valley, California

AREAS OF EXPERTISE