WASTEWATER NPDES/WDR PERMITTING
Clients: Multiple Clients (listed below)
Location: Various Counties in California
Clients: Multiple Clients (listed below)
Location: Various Counties in California
OVERVIEW
A cornerstone RBI service is National Pollutant Discharge Elimination System (NPDES) and Waste Discharge Requirements (WDR) permitting for our Publicly Owned Treatment Works (POTW) and industrial clients. RBI staff have prepared reports of waste discharge (ROWD) for renewal of waste discharge requirements (WDRs)/NPDES permits for numerous municipal wastewater dischargers in California for the past three decades. The ROWDs included a facility and discharge characterization, facility performance and compliance evaluation, justifications for modified monitoring and reporting requirements, and requests for consideration in the development of effluent limitations.
Following preparation of the ROWD, RBI assists clients during the period when Regional Water Board staff are developing the WDRs/NPDES permits by facilitating data reviews and responding to requests for supplemental information. RBI conducts thorough reviews of draft permits and prepares detailed written comments on the preliminary draft and tentative draft NPDES permits to identify factual corrections and to assess the appropriateness of effluent limitations, receiving water limitations, monitoring requirements, and special provision requirements. In addition, RBI staff prepare “infeasibility analyses” needed to justify inclusion of compliance schedules in the NPDES permit or in outside order (e.g., time schedule order).
PROJECT INFO
Clients: RBI has led the preparation of ROWDs and negotiated NPDES permits for the following clients, and has done so for multiple permit cycles for our long-term clients.
Location: Various Counties in California
• El Dorado Hills WWTP – El Dorado Irrigation District
• Deer Creek WWTP – El Dorado Irrigation District
• Gold Ridge Unit No. 3 – El Dorado Irrigation District
• Brentwood WWTP
• Stockton Regional Wastewater Control Facility/Water Recovery Center
• City of Turlock Regional Water Quality Control Facility & Turlock Irrigation District
• Lathrop Consolidated Treatment Facility
• Mountain House WWTP
• Placerville Hangtown Creek Water Reclamation Facility
• Lake Wildwood, Lake of the Pines, and Cascade Shores WWTPs – Nevada Co.
• Linda County Water District WWTP
• Town of Windsor Wastewater Treatment Facility
• Roseville Pleasant Grove WWTP
• Roseville Dry Creek WWTP
• Vacaville Easterly Wastewater Treatment Plant
• Woodland Water Pollution Control Facility
• Tuolumne Utilities District – Sonora Regional WWTF & Reclamation System
• Lincoln Wastewater Treatment and Reclamation Facility – City of Lincoln/Del Webb
• Lehigh Southwest Cement Company
• City of Ione
• Colusa Industrial Properties
• City of Santa Rosa
• Los Coyotes Water Reclamation Plant and Long Beach Water Reclamation Plant – Los Angeles County Sanitation Districts
• Placer County – Sewer Maintenance District 1, Sewer Maintenance District 3, Sheridan, and Applegate Wastewater Treatment Plant
AREAS OF EXPERTISE
Report of Waste Discharge Preparation
NPDES Permit Negotiations
Effluent Quality Assessments
Reasonable Potential Analyses
Antidegradation Analyses
Best Practicable Treatment and Control Assessments
Calculation of Water Quality Based Effluent Limitations
Calculation of Applicable Ammonia Limitations
Determination of Water-Effect Ratios for Copper and Zinc
Determination of Dilution Credit and Mixing Zones
Review and Comments on Preliminary Draft and Tentative Draft NPDES Permits
Preparation of Infeasibility Analyses and Development of Time Schedule Orders and In-permit Compliance Schedules
Representation of Discharger at Water Board NPDES Permit Adoption Hearings