WASTEWATER TREATMENT ENGINEERING & OPERATIONS SUPPORT

Client: City of Stockton

Location: Stockton, CA

OVERVIEW

For over a decade, RBI has provided the City of Stockton with engineering and operational support at the Stockton Wastewater Recovery Center (WWRC), assisting the City in navigating complex treatment challenges and optimizing WWRC performance. This long-standing professional relationship has involved a wide range of technical services, each tailored to meet evolving regulatory requirements and site-specific operational needs.

RBI has worked closely with City operations staff to enhance disinfection and dechlorination systems, including optimization of the WWRC’s chloramination disinfection process, replacement of ammonia dosing pumps and optimization of the ammonia dosing system and controls, implementation of a sodium bisulfite dosing system for dechlorination of chlorinated effluent, flow measurement troubleshooting and improvements, biosolids treatment and handling, and biological treatment challenges diagnosis and resolution. These efforts involved engineering analyses, frequent field testing, performance monitoring, and adaptive adjustments informed by operator feedback and real-time plant data.

The City recently constructed the Modifications Project, a $220M project that primarily implemented a new secondary treatment system for biological nitrogen removal, disk filtration system, and an ultraviolet (UV) disinfection system. In response to startup challenges with these systems, RBI has provided diagnostic assessments and assisted with implementation of targeted solutions to improve system performance and meet treatment objectives. This effort has included coordination with the equipment manufacturers to troubleshoot the potential issues. RBI also developed Standard Operating Procedures (SOPs) for sampling the UV system effluent for total coliforms and maintaining the disk filter and UV systems.

As part of the Modifications Project, RBI led efforts to site, design, and implement a new outfall to the San Joaquin River that allows for discharge of treated effluent from the new UV disinfection system. RBI’s engineering group conducted the conceptual design and siting for this new outfall, along with outfall permitting provided by RBI’s environmental group. RBI also provided startup assistance for unit processes introduced through the Modifications Project, working side-by-side with City staff to commission new processes and troubleshoot startup challenges.

This ongoing partnership reflects RBI’s commitment to responsive, hands-on engineering support that improves wastewater operations and treatment performance and provides wastewater operations staff with the necessary tools and knowledge to operate their systems efficiently and meet water quality objectives.

PROJECT INFO

Client: City of Stockton

Location: Stockton, CA

AREAS OF EXPERTISE