WASTEWATER TREATMENT OPERATIONS SUPPORT
Client: City of Lathrop
Location: Lathrop, CA
Client: City of Lathrop
Location: Lathrop, CA
OVERVIEW
RBI provides operational support for the Consolidated Treatment Facility’s (CTF’s) new surface water discharge of effluent to the San Joaquin River to ensure compliance with the City’s new NPDES permit for this facility. Efforts are ongoing and include disinfection system tuning, reviewing engineering plans for input on NPDES permit-related compliance issues, advising on PLC and SCADA programming of alarms and meters to facilitate operational compliance, river discharge operations planning, NPDES permit monitoring improvements and coordination, NPDES permit compliance support, and general treatment plant operations assistance. In addition, RBI developed an hourly energy balance model to simulate wastewater cooling in an effluent cooling pond at the CTF. RBI aggregated climate and physical data and simulated the pond in both plug-flow and complete-mixed modes to bracket the range of expected cooling of CTF effluent in the pond. RBI used the energy balance model alongside historical river and CTF effluent temperature data to develop operating protocols for when to divert effluent into the cooling pond and when to discharge effluent directly to the San Joaquin River in compliance with NPDES permit temperature limitations. In addition, RBI has directed other project team members, including the City’s contract operator, Veolia North America, on design improvements and proper maintenance procedures to ensure effective treatment and NPDES permit compliance.
PROJECT INFO
Client: City of Lathrop
Location: Lathrop, CA
AREAS OF EXPERTISE
Wastewater operations
Chlorine disinfection
Wastewater dechlorination
Wastewater utility management
Wastewater treatment startup
New municipal wastewater discharges to a surface water body and NPDES permit compliance
Operations, maintenance, and monitoring protocols
Wastewater cooling and energy balance modeling