WASTEWATER TREATMENT PLANT REPLACEMENT

Clients: Northgate Resorts

Location: Emigrant Gap, CA

OVERVIEW

 The Cisco Grove Campground (Campground) is a historic campground that was originally constructed in the 1970s. The Campground utilizes a combination of small septic/leach field systems and an on-site wastewater treatment plant (WWTP) to treat and dispose of sewage generated at the site, with the WWTP treating the majority of sewage generated at the site. Northgate Resorts purchased the Campground with the intent of revitalizing what was once a prominent destination for many campers in the Sacramento area and beyond. In conjunction with Northgate Resorts, RBI conducted a condition assessment of the sewage treatment and disposal systems and developed a wastewater master plan for sewage treatment and disposal for the rehabilitated Campground. This master plan included expansion of some septic/leach field systems, retaining some septic/leach field systems, and construction of a new WWTP and associated leach field. The new WWTP and leach field would be capable of treating and disposing of buildout sewage generation for areas of the site serviced by that system, including new cabins, addition of many RV sites, new laundry facilities, a new day lodge, and a new restaurant, among other amenities.

With the wastewater master plan developed, RBI proceeded with sizing and design of the new WWTP and associated leach field. A package WWTP utilizing an extended aeration Modified Ludzack-Ettinger (MLE) treatment process was selected as the most economical and practical option for sewage treatment. RBI prepared bid documents for the new package WWTP and facilitated the bid process on behalf of Northgate Resorts. Upon selection of a vendor, RBI facilitated the WWTP procurement process, including working through revisions to the design with the selected vendor, reviewing and responding to submittals, and facilitating delivery of the package WWTP to the Campground site. RBI provided engineering services during construction of the new WWTP and associated leach field, including reviewing and responding to submittals and requests for information (RFIs), developing and reviewing change orders, facilitating startup/acceptance testing, and hosting and leading all project construction meetings. During the construction process, RBI staff were on-site several days per week to review construction progress and ensure the project was constructed according to the design intent. Construction of the project was completed in summer 2025.

In addition to providing the engineering design, bid preparation, and engineering services during construction, RBI also led the process to obtain new Waste Discharge Requirements (WDRs) for the effluent discharge from the replacement WWTP due to increased disposal capacity, including WDRs negotiations with the Central Valley Water Board.

The outcomes of RBI’s work at the Campground are a new WWTP and associated leach field that provide a high level of treatment and ample disposal capacity for sewage generated at the site for decades to come.

PROJECT INFO

Client: Northgate Resorts

Location: Emigrant Gap, CA

AREAS OF EXPERTISE